Please add the possibility to place a construction (action) in a location which already has a different construction (partially) in the way, by the appropriate demolition action being included automatically. This will make it more easily to draw plans or carry out new measures.
![](https://www.tygron.com/wp-content/uploads/2024/07/Utrecht_digital_twin_feature-300x114.jpg)